• HOME
  • ABOUT
    • Why TABB?
    • ANSI Accreditation
    • TABB Quality Assurance Program
    • Contractor Customer Satisfaction Program
    • SMACNA Endorsement Letter
    • U.S. Army Corps of Engineers Standard Modification
  • CONTRACTORS USING TABB
  • RESOURCES
    • Model Specs
    • HVAC Formulas
    • TAB Procedural Guide
    • International Mechanical Code
    • Find a Contractor
    • Index
    • UC Davis White Paper
    • Sample Test Forms
  • INDUSTRY INVOLVEMENT
  • CONTACT

alt_text

FROM THE DESK OF DAVID BERNETT
NEMIC Administrator



8 Steps to Getting Better Construction Documents


From: 8 Steps to Getting Better Construction Documents, Building Operating Management

According to Michael Tardif of “Building Operating Management” magazine, facility managers need to be precise and specific in what they ask for regarding construction deliverables. Here’s how:

Building owners receive project close-out submittals in three formats: drawings and documents, both paper and PDF; structured data in Excel spreadsheets, Sharepoint, or other database formats; and Building Information Models (BIM). Organizing, coordinating, and using this information for operations and maintenance can be a formidable challenge.

It doesn’t have to be that way.

Click here to read the full article.

NEMIC News

Learn about certifications, industry news, and more!
NEMIC  |  8403 Arlington Blvd., Suite 100, Fairfax, VA 22031

© 2022 All Rights Reserved.